478-508 to 509 Transmission Line Optical Ground Wire (OPGW) Replacement Transmission
478-508 to 509 Transmission Line Optical Ground Wire (OPGW) Replacement |
|
---|---|
Client | National Grid |
Completion Date | 2019 |
Location | Massachusetts |
Completed by | Harlan Electric Company |
Harlan Electric Company (Harlan Electric) crews replaced 5.9 miles of static with OPGW from the Edgar Substation in Weymouth to the Holbrook Substation in Holbrook.